All tools

Build cost

Price the build before the first order.

Price a conversion line by line, flat-pack kit or built from scratch.

Start with your route.

Build route
Starting allowance

Editable indicative UK planning allowances. Not quotes. Choosing a route or allowance level replaces current line prices with a new starting point. Make every number yours before you rely on it.

The working budget.

Switch off anything outside the build. Prices update live and stay in this browser.

Base van

The vehicle before the conversion budget begins.

£22,000

Vehicle purchase, before conversion costs.

Shell / structure

The parts that turn the panel van into your starting shell.

£5,600

Materials and fitting allowance for the interior shell.

Openings and ventilation work included in your plan.

Leave off if your build does not need it.

Electrics

A professional-only budget allowance.

£2,800

Professional only

Budget for a qualified professional to scope and complete the work you need.

Water

Tank, pump, fittings and the chosen water setup.

£700

Water storage, pump and associated fittings in your chosen setup.

Heating / gas

Professional-only allowances where these systems are included.

£2,200

Professional only

Budget for a qualified professional if heating is part of the build.

Professional only

Budget for a qualified professional if gas is part of the build.

Furniture / interior

The usable layout, bed and interior surfaces.

£6,000

Flat-pack kit or your own materials and fabrication allowance.

Sleeping, seating and finishing items not covered above.

Kitchen

Cooking, cold storage and the fixtures you choose.

£1,500

Appliances, fixtures and cooking kit selected for this build.

Cycling kit

Storage and carrying hardware for the mountain day.

£1,350

Internal carrying and protection for bikes and ride gear.

Leave off if all bikes stay inside.

Paperwork / end bits

Your allowance for the final decisions and loose ends.

£800

Allowance for professional checks, documentation, tools and small final purchases.

Keep the decisions clear

  • Electrical and gas lines are cost-planning placeholders only. Use qualified professionals for the work that applies to your build.
  • Keep invoices and written scopes separate from this planner. Vehicle, insurance and documentation choices depend on the vehicle and your intended use.